IRIDESC E UX · COMMAND
v30 · Program Primary Revision
INTERNALSTEP-BY-STEP

Command Daily Operations

A repeatable operator routine for using Command without turning normal daily work into production incidents.

Start-of-day operator sequence

1

Open Command through Access

Browser → Command

Confirm you are on https://command.iridesceux.com, not a local demo or old preview URL.

2

Check System Health

Command → System Health

Review Functions, D1, R2, Access identity, Broadcast Agent, HVN endpoints, and optional worker status. Distinguish required-core failures from intentionally-unconfigured optional services.

3

Check audit/recent changes

Command → Audit

Review recent deployment/config/content changes before touching the live schedule.

4

Check schedule and submissions

Command → Schedule / Submissions

Confirm the day’s programming and any creator-delivery/QC dependencies.

5

Check Master Control only after core health is green

Command → Master Control

Confirm selected market and monitor source before any TAKE.

Site Studio vs Code Studio

TaskUseWho
Text, image, link, alt text, safe content overrideSite StudioEditor+
HTML/CSS/JS/function code or repo fileCode StudioTechnical Admin+
Production deployment/configDeployment/technical workflowTechnical Admin+
SecretsProvider-native secret storage / Command vault where appropriateHighest-trust staff only

Create/edit content safely

  1. Select the correct site at the top of Command.
  2. Open the relevant module.
  3. Make one scoped change.
  4. Preview it.
  5. Check links/assets/accessibility text.
  6. Save/publish.
  7. Open the actual staging/public URL in a second tab and verify.
  8. Check the audit entry.

End-of-day sequence

  1. Confirm no test graphics/alerts/ads remain on air.
  2. Return all markets to expected normal presentation state.
  3. Review failed/aborted broadcast commands.
  4. Review audience/telemetry anomalies.
  5. Record unresolved incidents/tasks.
  6. Confirm backup/rollback information for any production deploy made that day.
  7. Sign out if using a shared workstation; never share browser profiles.

v24 daily rundown workflow

  1. Open Schedule / Rundown and choose the service date plus National or one local market.
  2. Build the day privately from 12:00 AM through 11:59 PM. Program, Live Event, Standby, and Commercial Break blocks are separate types.
  3. Attach an air-ready program master to every prerecorded Program block. Local markets may inherit National programming while carrying their own break clocks or local program overrides.
  4. Run Day Readiness. Resolve primary-block overlaps, missing masters, invalid break clocks, and unintended gaps.
  5. PUBLISH TO HVN WEBSITE only when the public EPG is ready. This does not put the schedule on air.
  6. A Technical Admin uses APPROVE DAY FOR AIR after content/QC review. This still does not arm automation.
  7. At the intended operating time, use GO LIVE / ARM THIS MARKET. Manual Live/OBS takeover remains available at any time.
Three separate gates: website publication, air approval, and automation arm are independent. Editing a draft block can never publish or air it by itself.